Smith Paints allocates overhead based on machine hours. Selected data for the most recent year follow.

Estimated manufacturing overhead cost $250187
Actual manufacturing overhead cost $245126
Estimated machine hours 20668
Actual machine hours 20753

The estimates were made as of the beginning of the year, while the actual results were for the entire year.

The predetermined manufacturing overhead rate per machine hour is? and explain if you can

0

Answer : predetermined manufacturing overhead rate per machine hour is $ 12.10

Working notes for the above answer is as follow

We have been provided with the information as follow

Estimated manufacturing overhead cost is $ 245126

Estimated machine hours is $ 20668

Actual machine hours is $ 20753

we do calcu;lation as follow

Total Estimated manufacturing overhead cost / Total Estimated machine hours

=250187 / 20668

=12.10